Press
Press
Coverage, our own announcements, and what you may use. For anything else, write to the press contact.
Our announcements
Bengaluru, 27 September 2026
Nirvish thruster passes vibration test at launch levels
The 1 N engineering model fired normally after random vibration and shock testing. Thermal vacuum cycling is next, in December.
Bengaluru, 22 August 2026
231 seconds measured in vacuum
Steady-state specific impulse of 231 s measured on the engineering model in our chamber in Peenya. The flight-model target is 245 s.
Bengaluru, 15 February 2024
Nirvish raises ₹14 crore seed round
Led by Ankur Hardware Fund with Peenya Angels Network, to build a vacuum chamber and qualify the 1 N thruster (sample).
Coverage
Sample coverage: the outlets and headlines are invented for this template.
- 30 September 2026The Deccan LedgerA Peenya shed, a vacuum chamber and a propellant you can handle in glovesArticle
- 28 August 2026Orbit & Industry WeeklyIndian startup reports 231 s from a 1 N green thruster on the groundArticle
- 12 November 2025Bengaluru Business ReviewWhy small satellites are short of thrusters, and who is building themFeature
- 3 April 2025Swadeshi Tech PodcastEpisode 88: the chemistry of not poisoning your satellitePodcast
- 20 February 2024The Deccan LedgerHardware startups raise seed rounds as space policy opens upArticle